Deano
11-01-2006, 11:54 AM
http://www.streetfighters.com.au/forum/upload/56848226845504.jpg
was disappointed with the choice and prices of catch cans available to rigged this bad boy up.
this project requires the follow
1 empty can of choice (best to buy a slab to be safe)
1 piece of ally to use as a backing plate
1 m6x20 s/steel cap screw
3 cable ties
300mm of 1/2 heater hose from autobahn
build time - about 15min (2-1/2 cans)
was disappointed with the choice and prices of catch cans available to rigged this bad boy up.
this project requires the follow
1 empty can of choice (best to buy a slab to be safe)
1 piece of ally to use as a backing plate
1 m6x20 s/steel cap screw
3 cable ties
300mm of 1/2 heater hose from autobahn
build time - about 15min (2-1/2 cans)